November-December 2009

  • 1
  • 2

Data Intergration: The Growth of Wireless Technologies in Process Industries

Part 3

Article Tools

Create a Link to this Article

Photo: Steve Mustard
An ATEX compliant wireless device is installed in a potentially explosive atmosphere to monitor the site and report incidents.

Additional Article Content

By Steve Mustard

Comments

The growing demand for increased monitoring and control of production and distribution assets can no longer be met by conventional methods alone. The cost of installing and maintaining field wiring at any site can be prohibitive, and, in some cases, the solution is not viable.

The average consumer has access to an increasing array of off-the-shelf wireless products, from Bluetooth keyboards and headsets through Generalized Packet Radio Service (GPRS) and Third-Generation (3G)-enabled handsets and laptops, to 802.11 wireless networks in their own homes. With increased adoption, the cost price reduces whilst the reliability and usability increases.

With so many standards and products available, the process engineer’s task of selecting the right option to meeting their automation requirements can be a major challenge. No one wants to choose the Betamax of the wireless world, but equally no one wants to miss out on a potential new solution that may solve today’s problem.

Whilst the range of standards and products can at first seem bewildering, they can mostly be categorized into three distinct types which suit the needs of the process engineer:

  • Wide Area Network (WAN). This would cover products that can enable communications from a data center or control room to large process works, typically many kilometers. Data rates in this type of network would need to be high enough to cope with frequent data
    updates and near-real-time control needs.
  • Local area Network (LAN). This would cover products for communications around a process works or in the immediate vicinity, typically a few hundreds of meters. Data rates in this type of network would need to be higher than WANs, to allow continuous updates and real-time control.
  • Personal or Plant Area Network (PAN). The Personal Area definition comes from the typical Bluetooth application of intercommunications of handheld device or peripheral communications. These types of applications typically require very high data rates, but only over a very short range, e.g., a few tens of meters. The Plant Area definition is intended to portray the needs of the process engineer to connect very remote items of plant for monitoring and control needs. Whilst still over a relatively short range, e.g., a few tens of meters, the data rates in this case may be lower than for Personal Area Networks. This allows for the use of products that operate at lower power consumption and, therefore, need less maintenance.
Photo: Steve Mustard
Many sites requiring monitoring or control are small and located in grass verges, main roads, and pathways.

The most common options are listed below:

  • GPRS. This is an enhancement on Global System for Mobile Communications (GSM) or 2G mobile networks as an interim step towards 3G. Also known as 2.5G (25 km/80 kbps).
  • Enhanced Data rates for GSM Evolution (EDGE). A further enhancement on GPRS (25 km/236 kbps)
  • Universal Mobile Telecommunications System (UMTS). 3G mobile network superseding GSM and GPRS (30 km/1–2 Mbps)
  • World Interoperability for Microwave Access (WiMAX). Defines a standards (802.16) for providing wireless data over long distances (10 km/70 Mbps)
  • WiFi. Intended to provide local network connectivity similar to wired Ethernet networks. Covered by a range of standards under the 802.11 group (30–50 m/300 Mbps)
  • Bluetooth. Provides a way to exchange information between devices such as mobile phones, PCs, and the like, over radio frequencies. The Bluetooth Special Interest Group maintains the standards (10–100 m/700 kbps).
  • Zigbee. Aimed at applications requiring low data rate, long battery life, and secure networking over a wireless connection (10–50 m/40 Kbps).

There are many other options available, including low power radio (under the MPT1 329 definition), UHF radio (MPT141 1), Power Line Carrier (where data is modulated over power lines), and a host of satellite solutions.

The key to creating a future proof and flexible wireless process control network is to recognize that no one wireless standard can solve all needs. Since a multi-communications network is required, this allows some room for flexibility for the future, as the future of any standard is always going to be uncertain. For instance, despite only being available for a few years, the GPRS network will eventually (circa 2012) be superseded by the UMTS network, and all GPRS equipment will need to be upgraded.

In the above figure, the three network layers (WAN, LAN, and PAN) can be seen radiating outwards from the data center/control room. This method allows the process engineer to connect an ever more remote plant into the network for monitoring and control purposes, whilst ensuring the solution is cost-effective. The equipment at the WAN and LAN level will need to cope with higher data rates and be permanently powered.

In addition to the initial capital outlay, the cost of powering the equipment can be expensive and inappropriate for some remote sites. However, using PAN equipment, such as Zigbee, the process engineer can install monitoring and control nodes that operate for many years on battery power.